About us  Production Facilities  Raw Materials  Reports  Welfare
Home Tender Communication
 
To feed its six thermal power generating units, Durgapur Projects Ltd requires about 6670 tonnes of coal per day. Six units together have an aggregate generation capacity of 401 megawatt per day. Of the total coal requirements, about 28% is required by the sixth unit alone which is so far the biggest one with 110 MW capacity. Three units of 77 MW each consume around 19%-19.5%of total coal requirement. The remaining two units of 30 MW each require about 7.5%-8% each of the power plant's total coal requirement.

In terms of tonnage, average daily coal requirement of the largest unit ( 110 MW) is 1848 followed by 1260-93 tonnes by three units of 77 MW each and 504 tonnes each by two units of 30 MW each.   

 
 
 
The Coke Oven plant produces 0.5 million tones of Coke per annum. Coke produced by DPL has already attained global standard. There are in all 100 ovens. Hard quality Coking coal  required for Coke Ovens  is sourced to  China and for Soft Quality Coking Coal is  procured from  China and Australia.

Five types of coke are produced at DPL's Coke Ovens. They include Foundry Grade (+80 mm); BF Grade (25-65 mm); Nut (15-25 mm); Pearl  (6-12 mm) and Breeze (0-6 mm). While in Foundry and BF Grade the ash content is 12.5%,  in Nut it is little higher at 12.8%.  In Pearl and Breeze types of Coke, the ash content is 13.5 %. 




About Us | Production Facilities | Raw Materials | Trade Information for Power | Product Quality Information | Welfare Activities
Powered by ONTRACK SYSTEMS LIMITED. Best viewed in 1024 x 768 resolution.     Copyright © The Durgapur Projects Limited. 2003